Windows/Oracle Primavera Systems Engineer

  • Herndon, VA
  • Full-time

Company Description

Visual Soft, Inc., is a Small Business Administration (SBA) certified 8(a), Woman-Owned Small Business (WOSB) and Economically Disadvantaged Women-Owned Small Business (EDWOSB). Founded in 1998, we have expertise in design, deployment and management of mission-critical applications and technology infrastructures for Federal and Commercial markets.

Visual Soft, Inc. is an Equal Opportunity Employer. Prospective employees will receive consideration without discrimination on the basis of race, color, religion, sex, age, national origin, veteran status or disability.

Job Description

Implement and support installation of Oracle/Primavera suite of products in a classified, multi-tiered environment. Identify and install underlying software dependencies. Configure MS IIS,PKI Web Certificates, Oracle Wallet Certificates, Single Sign On, SSL. Install Oracle 11G RDMS, Oracle Client, Oracle Primavera Application user on both Windows and Linux Operating Systems. Strong Web Logic experinece. Linux OS adminstration experience desireable. Candidate must possess strong touble shooting skills sets, as well as some integration experience.



MUST HAVE Top Secret/SCI Clearance with Full-scope Polygraph

Only Applicants with this clearance will be considered

  1. Oracle Primavera
  2. Web Logic experience
  3. Windows Server Administration experience
  4. Strong familiarity with Oracle with emphasis on recent versions (Oracle 11G)
  5. Experience in integrating systems

Intel Agency's experience highly recommended.

Additional Information